Halswell River Weed Screen – Environmental
This Halswell River project required a new weed screen installed under 3 meters of water, presenting a significant engineering challenge. Concrete-filled Blade Piles were installed to support the structure. Each pile was capped and prepared to receive tension cables, forming a stable and durable foundation for the weed screen. Through innovative thinking and the assistance of […]