East Tamaki KFC – Commercial

For this project at KFC East Tāmaki, we installed 22 Blade Piles with a 36-tonne capacity to effectively bridge underground services and overcome soft, uncontrolled fill soil conditions.

The site presented challenges, being both tight and located in a busy commercial area, but the Blade Pile system allowed for efficient installation with minimal disruption to the surrounding environment.

Leave a Reply

Your email address will not be published. Required fields are marked *