During construction of a new build in the Bay of Plenty, additional piling was required to improve earthquake performance and soil stability. With construction already underway, the challenge was to install the necessary foundations without delaying the project schedule or disrupting surrounding work on site.
Blade Piles provided the ideal solution for this close proximity piling situation, allowing the additional piles to be installed quickly and efficiently. The screw piling system required minimal excavation and produced low vibration, making it well suited for installation alongside an active construction site.
The required piling was completed within just a few days, enabling the project to maintain its construction timeline while ensuring the building foundations achieved the necessary strength and stability. This project highlights how Blade Piles can provide a fast, adaptable foundation solution when additional piling is required during construction.